Making room for a growing port
As the Port of Antwerp continued to expand, one of the most ambitious projects took shape around the turn of the millennium: the construction of the Deurganckdok. The first ground was broken in 1999, marking the start of a vast new dock, directly connected to the River Scheldt.
As a tidal dock, without locks, vessels can sail directly in and out from the river. Stretching 2.6 km and 450 m wide and with 5 km of quay walls, the Deurganckdok was designed to provide the port with much-needed additional container capacity.
DEME was involved in a wide range of works for the new dock, including dredging, excavation and large-scale earthmoving, the construction of quay walls, dikes and bank protection, as well as erosion protection. The scale was considerable: the earthworks alone involved excavating 5.5 million m³ of material. In 2005, the first part of the Deurganckdok was put into operation.
But the Deurganckdok is just one element of a much longer story. Throughout the history of the Port of Antwerp, DEME has left its mark on virtually every major phase of its expansion. From creating new docks and port areas to deepening access channels, reclaiming land and building maritime infrastructure, DEME's activities have repeatedly grown alongside the port itself. As Antwerp expanded, generation after generation, DEME was always there to help make that growth possible.